120 claims on completion dates of residential complexes
Developer (Saint Petersburg)
Mediation and development of a construction completion schedule
Avoided bankruptcy
problem
client
result
decision
case 2
Transfer of land for commercial development: overcoming administrative barriers
The client is faced with the need to change the category of the land plot for the implementation of a commercial project. The existing status of the land did not allow construction to begin, and the standard transfer procedure threatened with lengthy approvals and the risk of rejection.
We conducted a legal audit of the land documents and identified the optimal way to transfer the category
Successful land category change in a short time. The client got the opportunity to implement a commercial project without the risk of challenging the decision.
We have prepared a justification for the intended use of the site in accordance with the urban planning policy of the region.
We have minimized bureaucratic procedures due to strict compliance with regulations
We have organized cooperation with government authorities and relevant departments to speed up the process.
problem
result
actions
case 3
Tax optimization: reduction of the cadastral value of the business center
The owners of the business center were faced with an overestimated cadastral valuation of the facility, which led to a significant tax burden. The existing cost did not reflect real market indicators, creating unjustified financial losses.
We conducted an independent assessment of the facility, taking into account current market conditions and the actual characteristics of the building.
The cadastral value of the business center was successfully adjusted, which led to a significant reduction in the annual tax burden. The client not only achieved financial savings, but also insured himself against overpayments in the future.
We have prepared an evidence base, including a comparative analysis of similar objects
The cadastral value has been challenged in court
We have developed a legally justified position to challenge the cadastral value
problem
result
actions
case 4
Commissioning of a problematic facility
The investor purchased an unfinished shopping mall, which was frozen during the construction of the frame. The main difficulties:
The claims of the supervisory authorities have been settled
The building permit was restored
Legalized changes to the project documentation
We have received new technical specifications
Retail space is leased out
Permission to open has been obtained
The facility has been put into operation
The outdated project did not match the current snips
There was no coordination with the fire department
The validity period of the permits has expired
The investor began to receive income from the facility
problem
result
actions
case 5
Legalization of the industrial complex: from self-construction to legal status
The client was faced with the need to legalize the production complex, which was built without a full package of permits. The facility could be recognized as a self-construction site, which threatened its demolition or prohibition of operation.
The facility was examined for compliance with urban planning and technical standards.
The production complex has been successfully put into operation with a full set of permits.
We have developed a scheme for legalization through making changes to the documentation
We have received the necessary approvals from the regulatory authorities
By contacting us, you will receive qualified assistance in any matters related to the opening and closing of a business, as well as the legal aspects of doing business in Russia and abroad.: